Progression Planner — your upgrade roadmap
Pick where you are and where you want to be. The planner lays out the route as a step-by-step roadmap — each stage with its Water requirement, the clicks it will take at your build, and the upgrades worth buying on the way.
Overrides the pump estimate if entered.
On mobile most players tap 4–7 times per second.
Assumptions: No areas have been publicly documented with verified requirements yet, so the planner cannot build a route. It will activate as soon as area data is verified.
Not currently verified
No Area or Lake names, order, or unlock thresholds are publicly documented yet. No reliable public source documents this yet, so we show no number rather than a guess. Values will be added as soon as they can be verified.
How this tool works
- Select your current stage and your target stage.
- Select your pump or enter your observed Water per click.
- Enter your current Water and clicks per second for realistic timing.
- Follow the roadmap: each verified step shows requirement, clicks and estimated time.
FAQ
Why are some stages missing requirements?
Area and Lake names and unlock thresholds have not been published by any reliable public source yet. The planner shows stages it can verify and leaves unknowns marked — it doesn't invent requirements.
How is the time estimate computed?
For each verified requirement: clicks = requirement ÷ your Water per click, time = clicks ÷ clicks per second. Your pump choice (or an explicit per-click value) drives the estimate.
When will full area data arrive?
As soon as it can be verified — either when a source publishes consistent area data or when we can verify it in-game. The planner is built to light up automatically from the data files.
